[Date Prev][Date Next][Date Index]
Equipment Protection System
- Subject: Equipment Protection System
- From: zzt@ornl.gov (Jon Tischler)
- Date: Mon, 14 Nov 1994 13:18:58 -0500
As long as a question about the Equipment Protection System has been
raised, I would also like to know what the exact interface between the APS
and the CATS will be for the EPS. By this I mean what are the signals
required (or expected) of eachof us, and where will they be physically
located?
Jon
Jon Tischler Solid State Division
ORNL, Bldg 3025 internet zzt@ornl.gov TEL (615) 574-6505
Oak Ridge, TN 37831-6030 bitnet zzt@ornlstc FAX (615) 574-4143